3

Trolleybus 3

trolleybus

Operated by TPG · Petit-Saconnex et Servette

2
Routes
36
Stops
13.6 km
Length
1
Operator
1
Network

Trolleybus 3 (line 3) is a trolleybus line running through Petit-Saconnex et Servette, with 2 route variants covering 13.6 km and 36 stops.

Route Map

2 variants, 36 stops
Loading map…

Route Variants

2 variants
Genève, Crêts-de-Champel Grand-Saconnex, Gardiol
24 stops 6.8 km Wheelchair: yes
Grand-Saconnex, Gardiol Genève, Crêts-de-Champel
24 stops 6.8 km Wheelchair: yes

Stops Served

36 distinct stops
Athénée platform
Bel-Air platform
Bel-Air (C) stop_position
Bovy-Lysberg platform
Calas platform
Calas platform
Colladon platform
Colladon platform
Coutance (W) stop_position
Coutance (X) stop_position
Crêts-de-Champel (S) stop_position
Gardiol platform
Gare Cornavin platform
Genève-Champel-Gare platform
Genève-Champel-Gare/Peschier platform
Giacometti platform
Gos platform
Gos platform
Grand-Pré platform
Grand-Pré platform
Lyon platform
Maison des Parlements platform
Miremont platform
Miremont platform
Moillebeau platform
Moillebeau platform
Palais Eynard platform
Petit-Saconnex platform
Place Claparède platform
Place Claparède platform
Place de Neuve platform
Place de Neuve platform
Poterie platform
Servette platform
Tourelle platform
Trembley platform


Explore More


Frequently Asked Questions

Line 3
What type of transport is line 3?

Line 3 (Trolleybus 3) is public transport line (trolleybus) serving Petit-Saconnex et Servette, Genève, Switzerland.

Where does line 3 run?
Line 3 operates 2 route variants across 13.6 km:
  • Genève, Crêts-de-Champel Grand-Saconnex, Gardiol (24 stops, 6.8 km)
  • Grand-Saconnex, Gardiol Genève, Crêts-de-Champel (24 stops, 6.8 km)
How many stops does line 3 have?
Line 3 serves 36 stops.
Athénée
Bel-Air
Bel-Air (C)
Bovy-Lysberg
Calas
Calas
Colladon
Colladon
Coutance (W)
Coutance (X)
Crêts-de-Champel (S)
Gardiol
Gare Cornavin
Genève-Champel-Gare
Genève-Champel-Gare/Peschier
Giacometti
Gos
Gos
Grand-Pré
Grand-Pré
Lyon
Maison des Parlements
Miremont
Miremont
Moillebeau
Moillebeau
Palais Eynard
Petit-Saconnex
Place Claparède
Place Claparède
Place de Neuve
Place de Neuve
Poterie
Servette
Tourelle
Trembley
How long is line 3?

Line 3 covers a total network length of 13.6 km (roughly 8.5 miles) across 2 route variants.

Who operates line 3?

Line 3 is operated by TPG . It runs as part of the Unireso network.

What other lines run near line 3?
Is line 3 part of the Swiss public transport network?

Yes - Line 3 (Trolleybus 3) is part of Switzerland's national integrated public transport network (Verbund). Swiss public transport is coordinated so that connections between different operators and modes are timetabled together - passengers can travel seamlessly across Petit-Saconnex et Servette and onwards across Switzerland using a single ticket. See all transport in Genève or see all Switzerland transport